SALEM, Va. (WFXR) – The City of Salem is advising residents of road work that will begin on Friday, January 10.
Consider the following:
- Water line repairs are taking place on Red Lane between Carrollton and Honeysuckle are finished.
- Work also continues to evolve on East Main Street in the Downtown Corridor with sidewalk replacement. Several detours are in place.
- The Colorado Street bridge is now in phase two. Traffic is reduced to one lane in each direction. Please slow down in all work zones, be aware of new traffic patterns, and check road closings daily at this link.