SALEM, Va. (WFXR) – The City of Salem is advising residents of road work happening on Thursday, December 12.
The road work includes the following areas.
- Railroad track removal is on Roanoke Blvd near Electric Road. Please follow the detour signage.
- Water line repairs are happening on Pyrtle Drive between Peach Street and Page Street.
- Water repairs are also on Ft. Lewis Blvd from Medford Road to the Roanoke County line.
- Curb repair is taking place on E. Burwell Street between Richfield Ave. and Thompson Memorial. Dr.
- Work also continues to evolve on East Main Street in the Downtown Corridor with sidewalk replacement. Several detours are in place.
- The Colorado Street bridge is now in phase two. Traffic is reduced to one lane in each direction. Please slow down in all work zones, be aware of new traffic patterns, and check road closings daily at this link.